Commissioning Plan 2017
From HallCWiki
Revision as of 14:14, 5 January 2017 by Bericic (talk | contribs) (→2017 Hall C Commissioning Plan (draft))
2017 Hall C Commissioning Plan (draft)
Magnet Field Setting
HMS
- ALWAYS set DIPOLE by NMR coming DOWN from 900A - still true?
- Set QUADS by initially setting to a current of 200 A above the set currents (or the maximum current of 1100 A for Q1 if set current + 200 > 1100), and then coming DOWN.
SHMS
- Set HB magnet to 1500 A and then go up or down setting HB by NMR
- Set QUADS … - need Q1 mapping data in form we can decide on this
Set DIPOLE by NMR (or with Hall Probe at highest momentum settings, not relevant for this commissioning plan) …