Fall 2017 Commissioning Plan
From HallCWiki
Table of Commissioning Tasks
Task | Person | Comment |
Harp scans and BPM checkout. Raster checkout. | ||
Final HMS and SHMS detector checkout plans. Defocused tune? | ||
Checkout of quartz plane | S Malace | |
HMS and SHMS trigger efficiency with Hodo, Hodo+ Cerenkov. | ||
HMS and SHMS DC checkout, software alignment and tracking efficiency | ||
Beam energy | ||
BCM Calibration | D. Bhetuwal, D Mack | |
Target Boiling | ||
Carbon elastic with sieve for final SHMS tune determination | M Jones | |
Carbon elastic scan for delta matrix optimization | H. Bhatt, D. Dutta | |
Carbon inelastics with sieve for Ytgt, Y’tgt and X’tgt ( Need 20 deg for Ytgt) | M Jones | |
Sieve check after cycling SHMS magnets from positive to negative and back | M Jones | |
A. Karki, S. Basnet, D. Dutta | ||
Inelastic carbon xn measurements with overlapping momentum settings to for acceptance check. | ||
GEM Front Sieve to better understand HB. Do optics with p+ to check optics. | L. Kabir, D. Dutta | |
Coincidence timing checkout and optimization. | ||
Electronic deadtime checkout. | ||
Single Kaon production. Coincidence p and K production. |
Fall 2017 Commissioning Plan
- The plan will be base on the plan of the full SHMS/HMS commissioning.