User contributions
From HallCWiki
Jump to navigationJump to search- 12:53, 6 September 2020 diff hist +1 D2n Run Plan 2020 →Data Collection Status
- 16:22, 4 September 2020 diff hist 0 D2n Run Plan 2020 →Data Collection Status
- 14:04, 4 September 2020 diff hist 0 D2n Run Plan 2020 →Data Collection Status
- 22:30, 3 September 2020 diff hist +184 Shift Checklist Help
- 16:50, 2 September 2020 diff hist 0 File:Glass Cell Target Change Procedure.pdf Brads uploaded a new version of File:Glass Cell Target Change Procedure.pdf current
- 16:49, 2 September 2020 diff hist 0 File:Glass Cell Target Change Procedure.odp Brads uploaded a new version of File:Glass Cell Target Change Procedure.odp current
- 13:58, 2 September 2020 diff hist +218 D2n Run Plan 2020 →1-pass Running
- 13:50, 2 September 2020 diff hist -156 D2n Run Plan 2020 →Necessary Prep work during Hall Controlled Access on Monday (schedule with RadCon in advance)
- 13:48, 2 September 2020 diff hist -6 D2n Run Plan 2020 →Necessary Prep work during Hall Controlled Access on Monday (schedule with RadCon in advance)
- 13:43, 2 September 2020 diff hist +11 D2n Run Plan 2020 →1-pass Running
- 13:42, 2 September 2020 diff hist +9 D2n Run Plan 2020 →1-pass Running • Starting Mon, Aug. 31; Ending Thu, Sep 3
- 08:08, 2 September 2020 diff hist +1 D2n Run Plan 2020 →Data Collection Status
- 23:38, 30 August 2020 diff hist +18 D2n Run Plan 2020 →Polarized 3He Runs, 3He elastic and QE longitudinal Asymmetries (4--8 hours)
- 23:26, 30 August 2020 diff hist -604 D2n Run Plan 2020 →Run Plan for 1-pass
- 23:22, 30 August 2020 diff hist +29 D2n Run Plan 2020 →SHMS/HMS scintillator bars settings for He3 Elastic and QE runs
- 23:15, 30 August 2020 diff hist +2 D2n Run Plan 2020 →Run Plan for 1-pass
- 22:54, 30 August 2020 diff hist +495 D2n Run Plan 2020 →1-pass Running
- 22:41, 30 August 2020 diff hist +12 D2n Run Plan 2020 →Moller Measurement (4--8 hours; Cancelled)
- 22:39, 30 August 2020 diff hist +12 D2n Run Plan 2020 →HMS Paddle Optimization for He3 QE Measurement
- 22:39, 30 August 2020 diff hist +23 D2n Run Plan 2020 →HMS Paddle Config Optimized for He3 Elastic Measurement (11.7deg, -2.08234 GeV/c)
- 22:37, 30 August 2020 diff hist +5 D2n Run Plan 2020 →3He Reference Cell Runs (N2 and 3He Pressure Curves, False Asymmetries) (5hrs ideal, 3 hrs min)
- 22:37, 30 August 2020 diff hist +494 D2n Run Plan 2020 →3He Reference Cell Runs (N2 and 3He Pressure Curves, False Asymmetries) (5hrs ideal, 3 hrs min)
- 22:34, 30 August 2020 diff hist +120 D2n Run Plan 2020 →Polarized 3He Elastic Longitudinal Asymmetry (until end of 1-pass running)
- 22:32, 30 August 2020 diff hist +2 D2n Run Plan 2020 →SHMS/HMS scintillator bars settings for He3 Elastic and QE runs
- 22:26, 30 August 2020 diff hist +6 D2n Run Plan 2020 →HMS Paddle Config Optimized for He3 Elastic Measurement (11.7deg, -2.08234)
- 22:25, 30 August 2020 diff hist +25 D2n Run Plan 2020 →SHMS Paddle Configuration Optimized for He3 Elastic Measurement
- 22:25, 30 August 2020 diff hist +20 D2n Run Plan 2020 →HMS Paddle Config Optimized for He3 Elastic Measurement
- 22:20, 30 August 2020 diff hist +30 D2n Run Plan 2020 →Run Plan for 1-pass
- 22:17, 30 August 2020 diff hist -1 D2n Run Plan 2020 →Polarized 3He Runs, 3He elastic and QE longitudinal Asymmetries (8-16 hours)
- 22:15, 30 August 2020 diff hist -26 D2n Run Plan 2020 →Polarized 3He Elastic Longitudinal Asymmetry (8hrs -- end of 1-pass running)
- 21:28, 30 August 2020 diff hist +338 D2n Run Plan 2020 →1-pass Running
- 16:19, 30 August 2020 diff hist +31 D2n Run Plan 2020 →Necessary Prep work during Hall Controlled Access on Monday (schedule with RadCon in advance)
- 16:15, 30 August 2020 diff hist +101 D2n Run Plan 2020 →Necessary Prep work during Hall Controlled Access on Monday (schedule with RadCon in advance)
- 16:13, 30 August 2020 diff hist -4 D2n Run Plan 2020 →Verify the following before 1-pass period
- 16:12, 30 August 2020 diff hist -10 1-pass calibration for A1n (Jan 2020) Undo revision 16232 by Brads (talk) current
- 16:12, 30 August 2020 diff hist +10 1-pass calibration for A1n (Jan 2020) →Polarized 3He Delta Transverse Asymmetry (4-8hr)
- 15:53, 30 August 2020 diff hist +889 D2n Run Plan 2020
- 15:41, 30 August 2020 diff hist +1 D2n Run Plan 2020 →Moller Measurement (4--8 hours; Cancelled)
- 15:41, 30 August 2020 diff hist -4 D2n Run Plan 2020 →Moller Measurement (4--8 hours; Must or Like?)
- 15:37, 30 August 2020 diff hist -355 D2n Run Plan 2020
- 15:31, 30 August 2020 diff hist -11 D2n Run Plan 2020 →Moller Measurement (4--8 hours; Must or Like?)
- 15:30, 30 August 2020 diff hist +59 D2n Run Plan 2020 →1-pass Running
- 15:27, 30 August 2020 diff hist -1 D2n Run Plan 2020 →Data Collection Status
- 15:26, 30 August 2020 diff hist +566 D2n Run Plan 2020 →1-pass Running
- 14:33, 30 August 2020 diff hist +89 D2n Run Plan 2020 →Pol 3-He Cell Changes
- 23:03, 29 August 2020 diff hist +236 Polarized Helium-3 Experiments →FAQ
- 23:02, 29 August 2020 diff hist +152 Analysis How-to →Short Analysis Instructions current
- 22:55, 29 August 2020 diff hist +311 Polarized Helium-3 Experiments →New Online Monitoring Instructions
- 21:40, 29 August 2020 diff hist -11 Spectrometer Rotation →SPECTROMETER ROTATION INSTRUCTIONS
- 21:39, 29 August 2020 diff hist -82 Spectrometer Rotation