RC meeting and Run Plan, Thursday Nov 1
From HallCWiki
Jump to navigationJump to searchStatus
- Cruising through Kin Group 14
- Kin Group 17 comes next (starting with Kin17.6)
- Reminders:
- Take one HMS monitoring run each shift
- For all settings, for each target, split the desired charge between three runs
For all settings at 60uA, take one of the three runs at 30uA insteadNo longer needed- Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.
Issues
- Coin time plot mark post 1 mark post 2
- Small percentage of missing ref times in one run
- RadCon NDX detector electronics reboots
- Shift workers needed in the next week shifts
- Day TO Sat/Sun
- Owl shifts all next week!
Planned access to the hall
- No Planned Accesses