RC meeting and Run Plan, Friday Nov 2
From HallCWiki
Jump to navigationJump to searchStatus
- Finishing up Kin Group 14
- Kin Group 17 comes next
- Plan to coordinate with Hall D for low-current running during their proposed TAC run on Wednesday
Time-Ordered Run Plan
- Kin14.20 currently running
- Kin14.21 ...
- Kin17.6 SHMS stepping down in angle...
- Kin17.5 ...
- Kin17.4 ...
SHMS POLARITY CHANGE
- Kin17.3
- Kin18.5 SHMS stepping up in angle...
- Kin18.6 ...
- Kin18.7 ...
- Kin18.8 ...
SHMS POLARITY CHANGE
- Kin18.1 SHMS stepping down in angle...
- Kin18.2 ...
- Kin18.3 ...
- Kin18.4 ...
HMS: (p same, angle to 16.3) SHMS: (p to 3.44, angle to 8.0)
- Kin13.5
SHMS POLARITY CHANGE (all else same)
- Kin14.5
Reminders
- Take one HMS monitoring run each shift
- For all settings, for each target, split the desired charge between three runs
- Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.
Issues
- Shift workers needed in the next week (Shift Signup)
- Day TO Sat/Sun
- Owl shifts all next week!
Planned access to the hall
- No Planned Accesses