RC meeting and Run Plan, Tuesday Nov 6

From HallCWiki
Revision as of 09:48, 6 November 2018 by Randallm (Talk | contribs)

Jump to: navigation, search

Back to List

Status

  • Down for System Recovery (~4hrs) today, should be up and running again this afternoon
  • In the midst of Kin Group 16 (three points only)

Time-Ordered Run Plan

  • (Beam Returns)
  • Kin16.7A (stay on LH2 while MCC tests 60uA running, then run LD2 and dummy)
  • Kin16.6 (finish up Dummy and LH2)

SHMS POLARITY CHANGE

  • Kin15.6
  • Kin15.4A
  • Kin15.7A

Reminders

  • Take one HMS monitoring run each shift
  • For all settings, for each target, split the desired charge between three runs
  • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.

Issues

Planned access to the hall

  • Mark: escorted access to reset crate during RF Recovery