RC meeting and Run Plan, Wednesday Nov 7

From HallCWiki
Revision as of 00:05, 8 November 2018 by Latif (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Back to List

Status

  • Finishing the truncated Kin Group 15 plan
  • Switch to E12-09-002 at during day shift

Time-Ordered Run Plan

  • Kin15.6
  • Kin15.4A
  • CSV SIDIS Takeover

Reminders

  • Take one HMS monitoring run each shift
  • For all settings, for each target, split the desired charge between three runs
  • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.

Issues

Planned access to the hall