RC meeting and Run Plan, Friday Nov 9

From HallCWiki
Revision as of 18:18, 9 November 2018 by Latif (Talk | contribs) (Time-Ordered Run Plan)

Jump to: navigation, search

Back to List

Status

  • Taking Kinematic Group 1 Data

Time-Ordered Run Plan

Detailed Group Kinematic Setting Here

  • Order of Kinematic Settings
    • Setting 1 (Q2=4, x=0.35, pi-)
    • Setting 5 (Q2=4, x=0.45, pi-)
    • Setting 6 (Q2=4, x=0.45, pi+)
    • Setting 10 (Q2=4.75, x=0.45, pi+)
    • Setting 11 (Q2=4.75, x=0.45, pi-)
    • Setting 13 (Q2=4.76, x=0.55, pi-)
    • Setting 14 (Q2=4.76, x=0.55, pi+)

Reminders

  • split the large desired charge between multiple runs (~1 hour per run)
  • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.

Issues

Planned access to the hall