RC meeting and Run Plan, Wednesday Nov 21

From HallCWiki
Jump to navigationJump to search

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • Started running during yesterday swing for kinematic Group 15 (Q2 = 4.77, x = 0.6, pi+)
  • Since swing yesterday beam was less reliable than weekend, e.g. two separate downtimes >1hr in owl shift.
  • At ~13:40 today completed kinematic group 15
  • Reconfigured for Group 11 (Q2 = 5, x = 0.5, pi+)
  • During HMS spectrometer move, drive controllers flagged red, reset not possible, tech-on-call called and controlled access made by J. Beaufait to reset shunt trip breakers on HMS and SHMS.
  • Currently running group 11.
  • For 11-3 rate test setting will be performed (changing beam current and cross-checking good coincidence yields)
  • RC Daily Update Wednesday, November 21

Current Run Plan

Notices in Effect for Shift Crew

  • If the HV trips for SHMS S1Y5B contact Simona M. DO NOT change the HV from the nominal value!
  • Shift leaders, please fill out the check list once per shift!
  • It is no longer required to fill out the standard.kinematics file online, it is now done automagically
  • Split the large desired charge between multiple runs (~1 hour per run)
  • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.
  • How-to power cycle PLC I/O chassis: https://logbooks.jlab.org/entry/3625862, https://logbooks.jlab.org/entry/3625900

Current Issues

Planned Accesses to the Hall

  • Monday, Nov 26: aerogel change and HGC work needs to be coordinated with Walter K., we must be in restricted access for this work

Planned Accelerator Configuration Changes

  • Sunday, Nov 25(?): Hall A goes offline and MCC wants to conduct high current beam study of energy spread at 40 uA. It is unclear that we will be effected
  • Monday, Nov 26: Energy change to 1.86 GeV/pass, we will be moved over to 500 MHz laser.

Special Requests