Management/software
From HallCWiki
Jump to navigationJump to search12 GeV software review
- Dry runs
- Email from Rolf
First dry runs for the software review talks are scheduled for Monday May 14th from 1 pm to 5 pm in F326/7. As float we have the next day, Tuesday from 3:30 pm on, at the same location. The main idea of these dry runs is to have presentations near-complete such that we can bounce ideas off each other, find omissions, make improvements. There do not have to be stand-uop presentations, mainly flipping through the various slides.
- Call in and EVO infomation
Title: JLab Software Review Preparations Password: 135711 Phone Bridge ID: 526 2531 Password: 4565 USA Phone num.: +1 626 395 2112 Call in by ESNet at +1 866-740-1260 (passcode number is 8542553)
- Charge of the committee.
- Agenda of meeting on June 7 and 8th.
- Current working drafts of morning and afternoon talks and backup material for June 2012 software review.
- Updated Morning Session 1 May 15th (Old Morning Session 1) for Steve Wood's section of morning talk
- Updated Morning Session 2 May 15th (Old Morning Session 2) for Mark Jones' section of the morning talk.
- Afternoon Session (May 10, 2012) Latest version from GN, includes SIMC material from JRA.
- DAQ Summary (May 11, 2012) from Brad Sawatzky
- SIMC overview - Possible backup material
- Miscellaneous stuff that might be useful. (Charge, Steve's software slides from January Meeting)
- All hall Documents for planning for a JLab softwrae readiness review