Testing SHMS Preshower
From HallCWiki
Jump to navigationJump to searchStatus
- The preshower has been cabled with signal and HV.
- Have checked setting each channel to 1400V that signal is seen.
- 06/28 Taking data for number of hits through calorimeter and external PMT's
Computer Setup
- Computer is called cnu. The account is gep5.
HV Setup
- Can control the CAEN 403 through terminal on cnu.
- Open terminal
- type "su" to login as superuser.
- type "minicom"
- Preshower HV cabling map