RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • Beam overnight was pretty good, we are now through all of the setup runs (Calibration, Heep, LumiScans)
  • Beam energy measurement was being carried out earlier this afternoon, beam issues have interrupted this slightly - hopefully done soon!
  • Spectrometers set and ready for physics data taking, starting soon!
  • Settings are quite low rate so we will be sitting at each one for quite a while
  • Some minor issues since yesterday, AC as reported was off, it was then switched back on but tripped off later. A short (~30 minute) access was made and this was fixed
  • Around 12:30 this afternoon one of the network switches in the hall was having an issue (https://logbooks.jlab.org/entry/3673278), luckily this was during the time the beam energy measurement was taken and it was addressed with a short access at around 3pm

Current Run Plan

  • Follow the run plan and start herding in some Llamas
  • Times at each setting will be updated once we get a clearer estimate of the rates we see at these settings

Notices in Effect for Shift Crew

  • Please take a screenshot of the spectrometer angles when they are moved to a new position and make a log entry. If working on a kinematic that lasts several days take an image daily.
  • Pay attention to the notices posted in the counting house regarding HMS Q1/Q2.
  • If HMS interlocks when ramping, check the live camera image of the HMS power supplies for smoke/water before clearing the interlock.

Special Requests