Run plan for VCS

From HallCWiki
Revision as of 22:39, 19 June 2019 by Atac (Talk | contribs)

Jump to: navigation, search

E12-15-005 VCS experiment run plan is summarized in the table below:

HMS SHMS TARGET I (uA) RASTER DURATION Q (C) TRIGGER DAQ STATUS
P(MeV) THETA(Deg) P(MeV) THETA(Deg)
Kin IIIb 794.68 60.74 4034.44 7.68791 LH2
KinIIIa 794.68 27.99 4034.44 7.68791 LH2
KinIa 893.20 37.33 4034.44 7.68791 LH2
KinIb 893.20 51.40 4034.44 7.68791 LH2
KinIIb 859.89 55.52 4034.44 7.68791 LH2
KinIIa 859.89 33.21 4034.44 7.68791
Kin Va
Kin Vb