Run plan for VCS

From HallCWiki
Revision as of 22:47, 19 June 2019 by Atac (talk | contribs)
Jump to navigationJump to search

E12-15-005 VCS experiment run plan is summarized in the table below:

HMS SHMS TARGET I (uA) RASTER DURATION Q (C) TRIGGER DAQ STATUS
P(MeV) THETA(Deg) P(MeV) THETA(Deg)
Kin IIIb 794.68 60.74 4034.44 7.68791 LH2 5.62
KinIIIa 794.68 27.99 4034.44 7.68791 LH2 4.32
KinIa 893.20 37.33 4034.44 7.68791 LH2 5.18
KinIb 893.20 51.40 4034.44 7.68791 LH2 6.05
KinIIb 859.89 55.52 4034.44 7.68791 LH2 5.62
KinIIa 859.89 33.21 4034.44 7.68791 LH2 4.32
Kin Va 995.20 38.50 3970.49 9.05217 LH2
Kin Vb 995.20 51.11 3970.49 9.05217 LH2