Status ( updated Aug 16th)

  • Run 69 going for the plus side. Moved P14 from splitter to a linear FI/FO to increase pulse size.
  • Problems with FADC
    • Missing data every other trigger
    • After about 8000 events, errors start to show up for some events. See this example
    • When comparing ADC spectra with and without cut on TDC see problem. With TDC cut expect ADC spectra to be only above the TDC threshold. But what is seen is just a general reduction of events. See this plot which shows the ADC spectra for the the 14 PMT without TDC cut ( black) and with TDC cut (red) for trigger of P1 and P14.

Computer Setup

  • Computer is called cnu. The account is gep5.

HV Setup

  • Can control the CAEN 403 through terminal on cnu.
    • Open terminal
    • type "su" to login as superuser.
    • type "minicom"
  • Listing of the HV setting and cable numbering for the preshower and scintillators
  • Preshower HV for Neg and for Positive side on July 30th at 4:41

Event Data

  • Coincidence data between SHMS Cal and external PMTs Hits per hour
  • Diagram of modules used for collecting coincidence data Module Diagram
  • Voltage versus PMT# plots for the negative and positive sides of the calorimeter. plot

Data taking Log

Run number Start Date/Time Trigger PreShower Threshold Scintillator Threshold End Date/Time Events HV figure Comments
34 July 30th 17:53:19 P1 && P14 20mV N/A July 31st 09:29:09 368 Pos HV] TDC range 1024ns (250ps/ch)
35 July 31st 09:37:27 P1 && P2 20mV N/A July 31st 10:29:10 2178 Pos HV] TDC range 1024ns (250ps/ch)
36 July 31st 14:29:14 P1 && P2 20mV N/A July 31st 14:35:00 144 Pos HV] TDC range 1024ns (250ps/ch power outage ending run)
37 July 31st 14:38:13 P1 && P2 20mV N/A July 31st 14:56:13 738 Pos HV] TDC range 1024ns (250ps/ch)
38 July 31st 15:26:35 P1 && P5 20mV N/A July 31st 15:47:02 119 Pos HV] TDC range 280ns (70ps/ch) power outage ending run
40 July 31st 19:43:43 P1 && P5 20mV N/A Aug 1st 10:24:51 6367 Pos HV] TDC range 280ns (70ps/ch)
41 Aug 1st 10:33:25 P1 && P2 20mV 50mV Aug 1st 11:04:16 1240 Pos HV Scint HV TDC range 280ns (70ps/ch) Added scintillators to the TDC with threshold = 50mV
42 Aug 1st 11:07:31 P1 && P2 20mV 50mV Aug 2nd 9:38:29 55941 Pos HV Scint HV TDC range 1024ns (250ps/ch)
43 Aug 2nd 9:52:34 P1 && P2 15mV 40mV Aug 2nd 11:46:39 9183 Pos HV] Scint HV TDC range 1024ns (250ps/ch)
44 Aug 2nd 11:55:03 P1 && P2 10mV 30mV Aug 2nd 15:02:54 28155 Pos HV] Scint HV TDC range 1024ns (250ps/ch)
45 Aug 2nd 15:45:12 P1 && P2 10mV 30mV Aug 2nd 17:26:06 26089 Updated Pos Preshower HV Scint HV TDC range 1024ns (250ps/ch) raised HV for bars 1,2,11 & 14
46 Aug 2nd 17:48:46 P1 && P6 10mV 15mV Aug 3rd 11:09:04 33524 Run 45 Preshower HV Scint HV TDC range 1024ns (250ps/ch)
47 Aug 3rd 11:10:29 P1 && P14 10mV 15mV Aug 3rd 14:43:08 1090 Run 45 Preshower HV Scint HV TDC range 1024ns (250ps/ch)
48 Aug 3rd 14:47:49 P2 && P14 10mV 15mV Aug 3rd 17:53:55 1243 Run 48 Preshower HV Run 48 Scint HV TDC range 1024ns (250ps/ch) Raised PSH1 HV, Scint Bot Mid HV
49 Aug 3rd 17:54:51 P2 && P14 10mV 15mV Aug 6th 10:24:59 25869 Run 49 Preshower HV Run 48 Scint HV TDC range 1024ns (250ps/ch)
50 Aug 6th 10:33:46 P2 && P14 20mV 15mV Aug 7th 09:31:34 2593 Run 49 Preshower HV Run 48 Scint HV TDC range 1024ns (250ps/ch)
51 Aug 7th 09:40:47 P2 && P14 10mV 15mV Aug 7th 12:27:43 1178 Run 51 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Raised HV on PSH1 & 2
52 Aug 7th 12:32:51 P2 && P14 10mV 15mV Aug 7th 16:33:46 1766 Run 52 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Raised HV on PSH 3-8, 10 & 11
53 Aug 7th 16:38:59 P2 && P14 10mV 15mV Aug 8th 09:50:15 7583 Run 53 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Raised HV on PSH 1,3-8,10 by 25V
54 Aug 8th 09:54:13 P2 && P14 10mV 15mV Aug 8th 13:54:02 1860 Run 54 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Raised all HV to 1600 except 2 (1550)
55 Aug 8th 14:01:04 P2 && P14 10mV 15mV Aug 8th 15:39:46 966 Run 55 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Raised all HV to 1650
56 Aug 8th 15:44:28 P2 && P14 10mV 15mV Aug 9th 09:45:36 12628 Run 56 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Raised all HV to 1700
57 Aug 9th 09:58:02 P1 && P2 10mV 15mV Aug 9th 13:21:32 99370 Run 56 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Changed trigger to p1 and p2
58 Aug 9th 13:42:16 N1 && N2 10mV 15mV Aug 9th 15:13:46 18024 Run 58 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Changed sides to N side
59 Aug 9th 15:17:31 N1 && N14 10mV 15mV Aug 10th 13:47:50 5633 Run 58 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Changed trigger to N1 && N14
60 Aug 10th 14:19:03 N1 && N14 10mV 15mV Aug 13th 10:03:31 16130 Run 60 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Changed HV on PMT# 3,5,6
61 Aug 13th 10:15:54 N1 && N14 10mV 15mV Aug 13th 13:38:57 1150 Run 61 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Changed HV on all PMT# up 50
62 Aug 13th 13:42:56 N1 && N14 10mV 15mV Aug 14th 09:33:02 9564 Run 62 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Changed HV on all PMT# to 1650
63 Aug 14th 09:43:11 N1 && N14 10mV 15mV Aug 14th 11:26:30 1047 Run 63 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Changed HV on all PMT# to 1700
64 Aug 14th 11:28:27 N1 && N14 10mV 15mV Aug 15th 09:30:34 12698 Run 63 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) no change looking for a bug
65 Aug 15th 09:35:43 N1 && N2 10mV 15mV Aug 15th 13:28:56 112919 Run 65 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) changed voltage on PMT 1 to 1650 and changed trigger to N1 and N2
66 Aug 15th 13:47:07 N1 && N3 10mV 15mV Aug 15th 16:44:47 37027 Run 65 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch)
67 Aug 15th 17:13:01 N1 && N5 10mV 15mV Aug 16th 10:40:10 86159 Run 65 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch)
68 Aug 16th 11:08:18 P1 && P14 10mV 15mV Aug 17th 10:07:08 13838 Run 68 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Switch back to plus side
69 Aug 17th 10:20:06 P1 && P14 10mV 15mV Run 68 Preshower HV Run 52 Scint HV TDC range 1024ns (250ps/ch) Move P14 from Splitter to Linear FI/FO.