Run plan

From HallCWiki
Revision as of 11:47, 27 November 2019 by Xiaochao (talk | contribs) (Created page with "== Commissioning == === Beam checkout === Detailed beam checkout instructions can be found here. {| class="wikitable" |- | style="background:...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Commissioning

Beam checkout

Detailed beam checkout instructions can be found here.

HMS SHMS TARGET RADIATOR I (uA) RASTER DURATION Q (C) TRIGGER DAQ STATUS
P P
Harp Scan Empty out 5 OFF 0:15 done
YAG: Beam spot Empty out tune OFF 0:05 done
YAG: Raster check Empty out tune 2x2 0:10 done
Carbon hole 4.712 17.08 (-) 5.389 15.81 (-) C-hole out 5 3x3 0:30 3/4 sep. done

Detector checkout and calibrations

Additional instructions:

  • We run both the COIN and separate DAQs during this phase!
  • Inelastic measurement:
    • Take 5min of MODE 10 data before starting the the inelastic measurement, then switch back to MODE 9.
  • Coinc elastic:
    • Take 5min of MODE 10 data before starting the the inelastic measurement, then switch back to MODE 9.
    • Take pre-scaled 3/4 singles in both arms, set pre-scalers so the singles rate is <100Hz
    • This run needs a special temporary trigger that will be connected to PS5
    • Make sure sure PS5 = 0
HMS SHMS TARGET RADIATOR I (uA) RASTER DURATION Q (C) TRIGGER DAQ STATUS
P THETA P THETA
Trigger checkout 4.712 17.08 (-) 5.389 15.81 (-) LH2 out 70 2x2 0:15 3/4 COIN done
PID checkout 4.712 17.08 (-) 5.389 15.81 (-) LH2 out 70 2x2 0:15 3/4 COIN done
PID checkout 3.5 21 (-) 3.5 21 (-) LH2 out 70 2x2 0:15 3/4 COIN skip
ECAL calibration 4.75 21 (-) 4.75 21 (-) LH2 out 70 2x2 0:15 3/4 COIN done
inelastic/ECAL calib 4.1 21 (-) 3.5 25 (-) LH2 out 70 2x2 ELREAL sep. done
inelastic 4.1 21 (-) 3.5 25 (-) Dummy out 40 2x2 ELREAL sep. done
optics (SIEVE) 4.1 21 (-) 3.5 25 (-) Optics-1 out 65 2x2 ELREAL sep. done

Unscheduled single-arm Run Plan

COMPLETED

Replaces original radiator and production trigger checkout. Click here for the single-arm SHMS run plan

Coincidence elastics

  • * Trigger:
    • run with ps6=0
    • Remember to click "save" when changing the pre-scalers!
  • J/psi-007 Instructions for Shift Takers
    • Do a 50k replay for every run. Carefully check the monitoring plots and discuss anything that looks strange with the analysis shift crew.
    • Fill out the Shift check list once every shift
HMS SHMS TARGET RADIATOR I (uA) RASTER DURATION Q (C) TRIGGER DAQ STATUS
P THETA P THETA
coinc elastic 4.95 25.6 (+) 6.5 19.2 (-) LH2 out 70 2x2 0:40 0.17 3/4 coin COIN done
coinc elastic 4.95 25.6 (+) 6.5 19.2 (-) Dummy out 40 2x2 0:15 0.04 3/4 coin COIN done
TIME (days) 0.04
Charge(mC) 204