Hall Access Check List

From HallCWiki
Revision as of 18:52, 1 December 2019 by Jpchen (Talk | contribs) (Created page with "Please fill up this check list before leaving Hall after target related work. * Flows *# Cooling Jet Flow *# Oven Air Flow * Laser Platform *# Laser Platform Enclosure is cl...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Please fill up this check list before leaving Hall after target related work.

  • Flows
    1. Cooling Jet Flow
    2. Oven Air Flow
  • Laser Platform
    1. Laser Platform Enclosure is closed
    2. Laser Tip Fan is On (you should feel the vibration from outside)
    3. No Tools left on the plateform
  • Target Chamber
    1. Target Chamber Enclosure is closed
    2. No Tools or magnetic item inside or near target coils
  • Bring out your tools and personal belongings
  • Interlock box
    1. All lights green