Backout Checklist after Hall Access for Target Work

From HallCWiki
Revision as of 11:41, 5 December 2019 by Jpchen (Talk | contribs) (Created page with "Please fill up this check list before leaving Hall after target related work. * Flows *# Cooling Jet Flow *# Oven Air Flow * Laser Platform *# Laser Connection and Tip Fan i...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Please fill up this check list before leaving Hall after target related work.

  • Flows
    1. Cooling Jet Flow
    2. Oven Air Flow
  • Laser Platform
    1. Laser Connection and Tip Fan is On
    2. Laser Box Panels are fully closed and light tight
    3. Interlocks are engaged
    4. No Tools left on the platform
  • Target Chamber
    1. Target Enclosure Panels are closed and light tight
    2. Interlocks are engaged
    3. No Tools or magnetic item inside or near Target Coils
    4. Bring out your tools and personal belongings
  • Interlock Box
    1. All interlock are engaged (lights all green)
    2. Switch in Normal Mode