RC Meeting and Run Plan, Fri, January 17th 2020

From HallCWiki
Revision as of 16:29, 17 January 2020 by Jones (Talk | contribs) (Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room </b> * Bluejeans remote connection information: To join the Meeting:...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

RC Meeting Information

RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

General updates

Current Run Plan

  • Take NMR every 4 hours
  • Always take 50Hz of EDTM

Thursday Swing/Owl


Friday Day

  • Moller measurement will start around 8am.
    • Start with Moller setup and measurement at present Wien angle (last about 4 hours).

Special Requests

  • Keep target expert schedule filled out on whiteboard
  • Andy Kenyon has parts ready for the nitrogen for the cooling jets.= Ongoing Work in the Hall
  • Bill Henry wants to removed a power supply from the hall. Need Radcon to survey it.

Notices in Effect for Shift Crew

  • Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
  • Magnet policies
    • HMS Q1 must be ramped down in 50A steps in all cases
    • Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
  • Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
  • The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
  • Ramp rate lock instructions are here and added to checklist[1]
  • Temporary Laser instructions can be found here [2]


Planned Accelerator Configuration Changes