PolHe3 Target Coil Rotation Plan, Mar 2020
From HallCWiki
Target coil rotation planned for March 13--20
- Nominal 1-week downtime in Hall C to rotate target coils, install new cell, and transition to d2n program
Bullet point Plan
- Friday, March 13
- It would be useful for Ethan, Bert, and the Techs to get in in the morning (after panels are off) and talk through the job
- Techs load up hardware for Hall in ESB in the morning
- Locate the extra beamline windows
- Optics table for Compass measurements
- Field measurement jig?
- Parasitic Cerenkov test hardware/stand
- Beam off at 8am
- Radcon Survey -- Move to Controlled Access
- Prep to open the Enclosure
- Laser controlled access
- Final measurements on target cell (EPR, etc)
- Plan for Hall to move to Restricted around 1pm
- Work through remaining DAY, SWING
- Bleed up beamlines *with N2* to allow up/downstream stubs to come off (Gaskell, Marble)
- Put guards on HMS/SHMS windows
- NOTE: Be beamline windows need to be protected from air (put in Rad bag and fill with dry nitrogen?)
- Target Group work (with RadCon support -- RW-II environment!)
- Remove target ladder/cell
- Remove reference cell
- RadCon remove their Contamination mitigation sheets
- Saturday, March 14
- Techs w/ Target group rotate the coils
- Bullet point outline from Bert:
- remove 6 helmholtz coil covers and 2 beampipes
- sharpie mark corrector coil location and rotations (so they go back in the same way)
- remove 4 corrector coil stands let corrector coils rest on bottom
- tape measure locate 4 new 3/8-16 tapped holes for the corrector coil
- tands (dimensions attached)
- check for items that will affect coil rotation
- rotate helmholtz coils ccw 45 degrees (to zero)
- survey helmholtz coils to zero degrees
- install covers and new beampipes
- check jet nozzles did not get disturbed for the beampipes
- Target work as needed/possible (Laser alignment checks, etc?)
- Sunday, March 15
- Complete rotation, recable where possible keeping in mind that we may need adjustments with Survey support on Monday
- Install the compass measurement optics table (remove ladder to upper target platform)?
- Monday, March 16
- Survey and Alignment
- Confirm target and beamline laser alignment
- Support setup for Field and Compass measurements (start in Swing?)
- Survey and Alignment
- Tuesday--Wednesday, March 17, 18
- Reinstall beamline windows, pump down beamlines when ready (install protective window guards)
- Possible pointing Surveys for SHMS, HMS (TBD)
- Field and Compass measurement continue as needed
- Install reference cell, leak check, etc.
- Install target cell as soon as possible
- Recommission target and start spinning up ASAP (through SWING and OWL as needed)
- Thursday, March 19
- Target optimization, Float
- Friday, March 20
- Deadline to start beam recovery to Hall
Drawings / Photos
- Photos of Target Setup (google drive link)
- CAD Models from Bert
- JT files
Component/Hardware Status
- Oven bottom plate (Arun/Bert)
- Follow up with Vince Pope in Machine shop (Arun?)
- Kepco power supply status (Bill/Todd?)
- Bill will update us on Wed
- We need to establish what target angles will be (remotely) accessible (90, 180, -90?, 0?)
- Target cell Austin (Xiaochao?)
- Only 'Reduced set' of density measurements available now, will continue measurements this week (issues with laser at UVa?)
- Wall and window thicknesses done
- It would be best for it to arrive at JLab on March 10 (at the latest) to allow locals to mount cell in oven plate before they get involved with target work in Hall.
- Lots of preplanning to be completed (RadCon, Techs, S&A, Target group, etc)
- Had job walkthrough meeting this (Monday) morning with the above parties -- so far, so good
- Must coordinate Tech support with the parasitic test installation plans
- RW-II training for JP, Arun, Brad, Bill
- Test is taken, awaiting the practicum (RadCon)
Items that are declared ready
- pNMR coil mount and wire for new cell
- on table in EEL target lab (Mingyu)
- spare convection heater strips
- on table in EEL target lab (Mingyu)
Target Field Measurements
Main page is here: Pol_He3_Field_Mapping_Data (Field and Compass data)
Field Mapping from November
- Pol_He3_Field_Mapping_Data (also updated by Jixie 2/26)
- High-level results file
- Copy also available here: https://userweb.jlab.org/~jixie/A1N/mapping
- He3_Target_Field_Mapping_Status_20200212.pdf -- Report from 2/12/2020
- File with pending questions/clarifications (Jixie working on response)
Compass Measurements
- Media:Procedure for compass measurement.pdf (Murchhana)