PolHe3 Punch List For Restart

From HallCWiki
Revision as of 13:05, 20 April 2020 by Wmhenry (talk | contribs) (A list of tasks which need to be done to return to d2n production)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
  • Fix the epics variable for target field angle. This is the PV which is calculated from the coils currents that is in the startOfRun entries. It needs a new formula since we changes the coil orientation (Bill)
  • Test Kepco in current mode (Bill)