RC Update and Run plan for Sep 20,2020
From HallCWiki
RC Meeting Information
RC Daily Meetings are M-F at 4:15 PM
To join the Meeting: https://bluejeans.com/861439920 To join via phone : +1.408.740.7256 (US (San Jose)), +1.888.240.2560 (US Toll Free))
** This page is in progress. **
Sunday 20 Sept 2020.
General updates
(See d2n Run Plan 2020 for broader status/overview.)
- d2n program completed around 9:30am (ran about 1 shift longer than initially planned)
- After looking at the He3 elastics data, it was decided to run 8 hour longer with some more aggressive paddle settings to improve statistics [1]
- E:QE ratio improved [2]; we'll have to work out the final numbers offline.
- Target polarization continues to improve (good!), NMR calibration constant is likely overly optimistic, needs updating (but we'll stick with it for now to maintain consistent relative numbers)
- Had an issue with s1y05+(B) signals were missing after paddles turned back on in the morning
- HV readbacks seemed to be good, thought this might be a issue with CAEN firmware, or in the DAQ/software chain. No problems found with signals when I got in to check -- puzzling.
- Simona reports this is a known issue (tube needs to 'warm up' or something) and should call her. Strange symptom... [3]
- Polarized 3He Elastic Longitudinal Asymmetry Study begins (E12-06-121A)
- 9:00am Rotated HMS to 17deg, and checked analysis cuts and paddle settings
- 9:50am Rotated SHMS to 13deg, no opportunity to check settings yet; beam went off
- 9:45am Beam off for MCC/Cryo to investigate 1L20 turbo cube issue (insulating vacuum) [4], and trim card problem [5]
- 1L20 Turbo Repaired/Reset by 10:30am
- MQA8A20 trim card issue identified later in this down
- 11:30 Beam back --- Production for E12-06-121A continues
- Beam will shut off at 7am, Monday morning for 1 hour of Beam Study tests to address energy stability issues
Notes for the Future
- Hall will move to Restricted Access on Monday
- Expectation is 11am--noon; depends when RadCon is available
- EPR photodiode will be replaced on Monday afternoon (JP, Junhao, RadCon)
- Bill, Murchhana check compass/field measurements
- Also checking with Jixie re: modeled fields
- Need to make a write-up that clearly defines all the different coordinate systems used, swapped power supply/polarity issues, etc.
- Start prepping for post-run work
- See POST-run Calibrations/Measurements for list
- HCList being prepared for submission on Sunday
Pending Issues
- Some beam energy stability issues have been noticed by Hall B (in particular); Jay is looking into this (Not immediate problem, just leaving this here as notes for future)
- These should not impact Hall C significantly, but may feed into beam polarization corrections.
- Jay has link some of this discussion to the Hall C beam energy measurement HCLog entry and cross posted to the HCLog. This will help us follow breadcrumbs during beam polarization analysis for 1-pass.
- Hall C beam energy drifted up after the Hall C beam energy measurement was taken [6]
- Hall B Moller Fri, 09/18/2020 - 10:20 was higher than expected: -86.233 +/- 1.494 (several percent) [7]
- Energy shift that would impact Hall B polarization at few percent level [8]
- Energy lock switched from 2A to 3C Sat (19th) @ 9:40 [9]. No notice to Halls, unfortunately..
Current Run Plan
Saturday DAY → Monday OWL
- See Polarized 3He Elastic Longitudinal Asymmetry Run Plan for details
- NOTE: Hall C is in control of the Charge Asymmetry feedback system until Monday
- Charge Feedback Parity DAQ Instructions
- We will have to run the
./FlipPCvaluesHallC
script in the Parity DAQ VNC session after every IHWP change
Monday DAY
- Rotate SHMS to 18.0 degrees when beam is off
- Stay at longitudinal/0 for initial tests. JP will provide details to Target group.
- Everything is opening up, so RadCon is pretty busy and isn't sure how quickly they will get to Hall C.
- Best guess is they'll be able to open the Hall to Restricted around 11--noon and be able to support the EPR diode swap in the afternoon
- POST-run Calibrations/Measurements are expected to take roughly 2 weeks.
Standing Orders
- Change the IHWP at least every 8 hours when running on glass cells. Call Halls A and B in advance. If there are any issues, call the RC
- NOTE: Hall C is in control of the Charge Asymmetry feedback system until Monday Charge Feedback Parity DAQ
- We will have to run the
./FlipPCvaluesHallC
script in the Parity DAQ VNC session after every IHWP change
- Ensure that all information in the CODA run-start GUIs is correct for every run!
- If beam goes away for more than 3h, or MCC does operations on the beam that may change the beam tune, then move target to No Target position,
- verify Harps scans at 3H07A and 3H07B are within spec, and
- ensure beam is stable (with all locks ON) at 0, 0mm before continuing.
- Beam recovery procedure has more detailed procedure if needed.
- New beam positions have been verified and established to be (0,0) mm for all targets.
- Monitor that beam is at (0,0) using the stripchart on the Wall screen and verify no scraping on the glass cells using the Analysis monitor.
- Check the position locks are on.
- Check that CODA is running normally
- Check online replays shortly after starting runs, & full replay results too.
- Fill BTA with realistic numbers. You may follow the guidance coming from "load from EPICS", if it does not overestimate the ABU (as it generally does). https://logbooks.jlab.org/entry/3783171. If we have to lower the beam current we actually want because the beam is too unstable, prorate the ABUs.
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !! !! !! ATTN: SHIFT LEADERS !! !! Please follow the shift summary template on !! !! the laminated SL instructions. !! !! !! !! ATTN: TARGET OPERATORS !! !! All NMR measurement HCLOG entries should include: !! !! 1) A title that clearly lists polarization !! !! 2) Screenshots of both NMR_FieldSweep and !! !! the polarization fit !! !! !! !! For an example see the following entry: !! !! https://logbooks.jlab.org/entry/3768696 !! !! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Notices in Effect for Shift Crew
- Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
- Magnet policies
- Follow the updated guidelines in the How-to#Spectrometer_Magnets Spectrometer Magnets How to
- Spectrometer GUI (
go_magnets
) should always be visible on Shift Leader computer, hcdesk3 - If any magnet trips, snapshot the associated power supply window and post it to hclog before resetting the interlock.
- Monitor the beam position on target and call MCC immediately if you see large excursions (1 mm level).
- When rotating the spectrometer, use HCCAM01 to keep an eye on the SOLID Cherenkov test stand when rotating SHMS (in addition to watching the live angle-cam image, etc). The updated rotation instructions are here: https://hallcweb.jlab.org/wiki/index.php/Spectrometer_Rotation#NOTICES_IN_EFFECT