To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
Tuesday Status
- No beam until roughly mid swing shift due to RF separator work
- This will continue (and hopefully finish) today
- Lots of other work done though
- Brad cycled the HGC gas see the log entry, thanks Brad!
- Light in the HGC looks a lot more like what we expect now, see the numerous log entries checking and confirming this -
- Ali updated the report file output, things look more realistic now as noted in his log entry
- Carlos checked on the BCM calibrations and implemented them - log entry
- I ran an updated SHMS Calorimeter calibration log entry
- This doesn't seem to have percolated through to some replays and/or it is a bit off
- Jacob and Simona are investigating
- I re-analysed an earlier setting and found that our improvements to various param files have helped a lot - log entry
- Simona was taking a closer look at the NGC following some quick analysis/checks I'd done in the morning, something look a bit odd log entry
- It looks like one side of the NGC sees drastically less light than the other
- Nearing the end of this kinematic point
- Nathan and the shift crew overnight rotated out to our central (SHMS 8.26) setting - log entry
- Not much longer at this angle once we get beam back, then we rotate out another 2 degrees to our left setting
- Running at 15uA on LD2, rates look ok as posted in this log entry
- For comparison, here's 8uA at SHMS 6.26 from last night - https://logbooks.jlab.org/entry/3905501
- See the status page for more
Current Status
- Down due to Hall D startup work again
- As far as I know, should expect beam in swing shift again
Current Run Plan
- Carry on with current setting once we get beam back
- Finish off the centre and left LD2- Q2=1.60, W=3.08 settings
- HeeP Singles next
- This will be a fairly intense block of shifts!
Current Issues
- The HGC now looks great as mentioned... but now the NGC looks strange
- Seeing next to nothing on one side of the fp
- See this log entry
Planned Accesses to the Hall