RC Meeting, Friday, Dec 3, 2021
From HallCWiki
RC Meeting Information
RC Daily Meetings are at 10 AM, remote
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
Current Status
- Q2=3.85, W=3.07, x=0.31, low epsilon, HMS angle=35.12 deg, HMS momentum = -1.332 GeV/c, SHMS angle= 8.39deg, SHMS momentum=-6.538 GeV/c;
- Summary of data and plans forward
- Energy Measurement
- Plan to be at this setting until Dec 4 Sat afternoon
Current Run Plan
- Day : Q2=3.85, W=3.07, x=0.31, low epsilon, HMS angle=35.12 deg, HMS momentum = -1.332 GeV/c, SHMS angle= 8.39deg, SHMS momentum=-6.538 GeV/c;
- Swing : Q2=3.85, W=3.07, x=0.31, low epsilon, HMS angle=35.12 deg, HMS momentum = -1.332 GeV/c, SHMS angle= 8.39deg, SHMS momentum=-6.538 GeV/c;
- Owl : Q2=3.85, W=3.07, x=0.31, low epsilon, HMS angle=35.12 deg, HMS momentum = -1.332 GeV/c, SHMS angle= 8.39deg, SHMS momentum=-6.538 GeV/c;
- The 3/4 trigger running will be done by the day shift.
- Need to do the AL dummy. SHould we do it this afternoon. How long?
- Called Steve Lassiter about angle change Sat afternoon
Notices in Effect for Shift Crew
- The Raster Coil pair Ax and Ay are off. Raster needs to be at 4x4.
- Can reduce the SHMS dipole LHE Lo alarmm to 50 and LOLO alarm to 45. Ask shift crew to do this.
- With LHe alarms it is good to check the cameras for plumes.
- With LNitrogen alarms are not that critical. Just need to start monitoring the problem with plot and halog.
- Checked SHMS angle GUI/Camera: 8.400/8.385 . Need to remind Steve or Amy to update the GUI value to match the Camera before move.
Current Issues
- The Raster Coil pair Ax and Ay are off
- Elevator is not working
Planned Accesses to the Hall
- none
Planned Accelerator Configuration Changes
- none
Special Requests
- Plan to do the BCm calibration on Tues at 2:30