RC Meeting, Monday, Dec 13, 2021
RC Meeting Information
Have RC meeting today
RC Daily Meetings are at 10 AM, remote
- Bluejeans remote connection information:
To join the Meeting: https://bluejeans.com/861439920 To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 861439920 To join via phone : 1) Dial: +1.408.740.7256 (US (San Jose)) +1.888.240.2560 (US Toll Free)) +1.408.317.9253 (US (Primary, San Jose)) (see all numbers - http://bluejeans.com/numbers) 2) Enter Conference ID : 861439920
Useful Links
- Fall 2021 Shift Schedule
- PionLT Physics Status
- PionLT Runplans
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
- OPS 7:45 RC meeting bluejeans link, weekends usually 9am.
- OPS daily 8:00 meeting and Wed 1:30 bluejeans link
Current Status
Current RC: Salina Ali, Dave Gaskell takes over after RC meeting
- Owl shift
Continuing from swing shift taking production data on LD2 at 70 uA Q2=6.00 W=2.40, x=0.31, low epsilon, HMS angle=34.58deg, HMS momentum = -2.139 GeV/c, SHMS angle= 9.12deg, SHMS momentum= 5.512 GeV/c; Approx 4500 pions after owl shift
- Day shift
Continue taking production data on LD2 at present settings.
Future plans
- Continue production data at 70 uA for LD2, and switch to LH2 target (estimated toward end of swing shift)
- Photo cathode forecast
- OPS Beam injector test tomorrow scheduled 9 AM- 1 PM (no beam during this time).
- Radcon (David Hamlette) confirmed they can allow controlled access 9-1 pm tomorrow during beam injector test to allow maintenance work on SHMS and HMS. Work by Walter Kellner and Steve Lassiter to start around 10 AM (after radon survey is complete). Not enough time to address HMS rotation issues.
- Check with Steve about moving to 6.16 degrees on Dec 20th. This can be done with remote oversight.
- Need to be sure that the Gui angle is modified to agree with the true angle when at 8.16 deg.
- Tues Dec 14th, there is a possible OPS test plan for 9-1 and Hall access.
Current Run Plan
We are currently on 8.0 GeV Part 2 [See run plan]
- Target: LD2
Q2=6.00 W=2.40, x=0.31, low epsilon, HMS angle=34.58deg, HMS momentum = -2.139 GeV/c SHMS angle= 9.12deg, SHMS momentum= 5.512 GeV/c
At about 9:30 am we had about 6500 pions
Notices in Effect for Shift Crew
- The Raster Coil pair Ax and Ay are off. Raster needs to be at 4x4.
- With LHe alarms it is good to check the cameras for plumes. If no plume and it is below the LO alarm and above LOLO then monitor with a plot and halog the problem.
- With LNitrogen alarms are not that critical. Just need to start monitoring the problem with plot and Halog.
Current Issues
- HCLOG had issues last night, posting entries and posting attached pictures
- William Gunning has fixed the issue with the raster pattern showing a rotating rectangle.
- There is a rotation issue that has come up if moving HMS between 19 to 25 degrees. It usually gets stuck around this range, please be wary of this issue. We will likely skip settings in this range if this drive controller error cannot be solved. For singles it will not be a big deal to skip settings for HMS at those angles.
- UPDATE on target pressure issue: Target pressure issue has been fixed
- Old: target pressure for loop 2, LH2, is lower than usual - around 17-18 psi. The alarm went off early in the day shift which brought it to the target operator's attention (Bill Henry). Usually acceptable pressure is around 22 psi. If this drops to atmospheric pressure, 14.7 psi, then we have a problem. The pressure for LH2 was around this range 17-18 psi during LD2 runs as well. We did contact target expert JP to resolve issue but it is currently ongoing and UNRESOLVED. We assume we can continue to take data. Most likely this would involve an access to the hall. See log entry from Greg Smith for an update on this issue (12:15 PM 12/11/21)
- The Raster Coil pair Ax and Ay are off
- Diffuser limit at 46uA
Crew Chiefs,
We have permission to raise the Hall C diffuser raster limit to allow running >46uA to Hall C. This limit is normally imposed when one of the two rasters is not operative. Since the hall was able to double the running raster current to get the same size raster on the target as having both rasters, Keith is allowing us to raise the limit.
To get to the setting, open the Hall C diffuser interlocks screen. Go to the bottom right corner and open the Expert screen. Just below and to the right of the FSD bits, raise the "Raster 1 OK Limit" to slightly above the highest current the hall wants to run at. Do not change the Raster 2 limit. Make a log entry with screen shots. Make an ABIL entry, System MPS and an expected removal date of 3 Jan. 2022.
Paul
Planned Accesses to the Hall
- Maintenance to pump down HMS transfer line.
- Need to clean the SHMS encoder wheel
Planned Accelerator Configuration Changes
- none
Special Requests
- none