Planned Accesses to the Hall

  • During the accelerator full maintenance day (Thursday Jun 23, 2022)
    • S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period [https://logboo\

ks.jlab.org/entry/4003796 HMS Dipole LCW] ( PENDING ) NOTE: Actually, Heidi and Jack will will need to access Hall C to work on HMS dipole, to get dimensions befor\ e ordering the parts needed to install the crush washers.

ch wire groups are noisy

    • Xinzhan Bai and Jixie Zhang request to change gas bottle for solid Cherenkov detector: Contact: xbai@jlab.org, cell: (434) 422-2809 ( PENDING )

Planned Accelerator Configuration Changes

  • Full accelerator maintenance day on Thursday, Jun 23. Beam will be taken away at 6:30 am

Special Requests

  • Mark Jones would like to take HMS optics data with a 4x4 mm^2 raster at some point (when HMS is at a lower momentum, i.e., current setting) for checks. ( DONE </s\

pan>)