June 24, 2022

From HallCWiki
Revision as of 07:21, 25 June 2022 by Wmhenry (talk | contribs) (→‎Current Run Plan)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Current Status

  • Accelerator status:
    • No Beam last 24 hours, expected back any minute
    • RF recovery did not go as well as planned
    • Will try to push to 80 uA (current 45 uA is highest stable available current)
  • Experiment status:
    • pionLT continues to make progress on run plan, though we are still behind schedule, unless Ops is able to deliver 80 uA at >50% efficiency
    • On page 33 of run plan. New Setting: Q2=2.45, W=3.20, x=0.21, high ε data taking. Angles are set, awaiting SHMS Dipole troubleshooting

Current Run Plan

pionLT Summer 2022 Run Plan

Physics Status

Notices in Effect for Shift Crew

  • Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be: ABU_prorated = 15/(max current limit) * ABU
  • Check the HMS/SHMS rates for when production starts, since for Heep coin. production SHMS saw higher rates. Make sure shift crew takes snapshot of scalers at every setting
  • When analyzing LD2 or Al dummy or LH2, please leave the target_mass_amu in the standard.kinematics as that of the proton, but when analyzing the data with the pionLT script, specify the target used, as different targets will have different ranges in the cuts when integrating the missing mass peak. Refer to log entry: https://logbooks.jlab.org/entry/4005387 These instructions are given in the pionLT run plan.

Current Issues

Planned Accesses to the Hall

    • Need new plan to address HMS DC noise. Replace cards with spares?

Planned Accelerator Configuration Changes

Special Requests

  • Mark Jones would like to take HMS optics data with a 4x4 mm^2 raster at some point (when HMS is at a lower momentum, i.e., current setting) for checks. ( DONE )