Sep 19 2022
From HallCWiki
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- Harp Scans completed (Sep 16 Swing) IHA3H07A --> https://logbooks.jlab.org/entry/4042622 | IHA3H07B --> https://logbooks.jlab.org/entry/4042625
- Downstream beamline valve was shutoff --> https://logbooks.jlab.org/entry/4042671 The issue was resolved by Hall C techs today at 7AM
- Currently receiving tune beam
Current Run Plan
- page 7 of CaFe Run Plan
- Resume beam tune to Hall C / Ion Chamber calibration with "No target" ( DONE )
- Do "Aluminum Hole" check to center BEAM on target ( DONE )
- Do Ion Chamber calibration for solid (using Thorium, 6% R.L.), and cryotargets (LH2, LD2) ( DONE )
- Ramp back up SHMS magnets to do trigger checkout using LH2 ( DONE )
- Do SHMS Hodo HV test / proton absorption / heep normalization ( DONE )
- Proceed to CaFe production @ mean-field kinematics for all targets ( IN-PROGRESS )
- LD2 - DONE
- Al Dummy - DONE
- C12 - DONE
- Ca48 - DONE
- Ca40 - DONE
- Fe54 - IN-PROGRESS
- Be9 - PENDING
- Be10 - PENDING
- Be11 - PENDING
- Proceed to CaFe production @ src kinematics for all targets ( PENDING )
- Ca40 - PENDING
- Ca48 - PENDING
- Fe54 - PENDING
- C12 - PENDING
- LD2 - PENDING
- Be9 - PENDING
- B10 - PENDING
- B11 - PENDING
- Al Dummy - PENDING
- Whenever MCC is able to deliver 70-75 uA stable beam current:
- coordinate with D. Mack to do BCM calibrations ( PENDING )
- do Target Boiling study whenever we have LD2 target in place (to save time of having to do target changes) ( PENDING )
Notices in Effect for Shift Crew
- Instructions for moving the target to "Hole" ---> https://logbooks.jlab.org/entry/4042703
Current Issues
- Target is unbale to move to "Hole" position, encoder position has to be put in by hand. D. Meekins / C. Keith currently working on diagnosis. All other targets were tested, and motion was verified.
- During shift checklist, Holly noticed some minor issues --> https://logbooks.jlab.org/entry/4042694