RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • SHMS: 26 degrees, magnet polarity reversed for positron study
  • HMS: 26 degrees, magnet polarity reversed for positron study

Current Run Plan

  • Controlled access during day shift to fix HMS Dipole
  • Continue with positron study as soon as HMS dipole work is complete
  • BCM calibration early next week?

Notices in Effect for Shift Crew

  • "cermode10" should be OFF for SHMS, ON for HMS
  • Pay attention to DAQ prescale settings
  • Update EDTM setting to give ~25 Hz AFTER prescale (see table near DAQ computers)
  • Use good electron fraction from 50k replay to estimate how many events will be needed to get required statistics
  • For settings with long runs/low rates, can run full replay (run_full_hms.sh and run_full_shms.sh)

Current Issues

  • SHMS paddle study outcome: will run with paddles 1-7 off in S1X and S2x
  • Should make offline runlist including some analyzed quantities (efficiencies, number of electrons)
  • SHMS PRLO will be removed from ELLO for 8 degree running
    • PRHI threshold will be reduced to current PRLO level


Planned Accesses to the Hall

  • Controlled access in AM for dipole work
    • See logbook entry and references therein for info on what happened

Planned Accelerator Configuration Changes

  • Hall A pass change on Friday --> will start after noon
  • Wein angle change on Friday

Special Requests