October 24, 2022
From HallCWiki
Jump to navigationJump to searchRC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- SHMS: 8 degrees, -9.2 GeV, 1x, 2x 1-7 off
- HMS: 20 degrees, -5.36 GeV (setting 3)
- 5pass beam, 30 to 60uA
Run Plan
- Continue data taking.
Issues
- north LINAC LCW aperture water flow fault. https://logbooks.jlab.org/entry/4067383
- HMC Q1 interlock https://logbooks.jlab.org/entry/4067179
- UNSER temperature spikes every time target moves. https://logbooks.jlab.org/entry/4066193 https://logbooks.jlab.org/entry/4066203
- SHMS prescaler GUI not responding https://logbooks.jlab.org/entry/4066217
- SHMS CODA crash. https://logbooks.jlab.org/entry/4066486
- SHMS angle camera broke https://logbooks.jlab.org/entry/4067379
- go with 4 million events per run to reduce time spent on CODA restart
- splitting evio file for faster decoding?
Notes
- watch beam stability
- need more shift workers.
To do
- Install Q1 SHMS vacuum gauge (~3hr)
- calibrate SHMS Dipole LN2 valve during next access https://logbooks.jlab.org/entry/4064490. For now, monitor the ice accumulation if any https://logbooks.jlab.org/entry/4064528