January 26, 2023

From HallCWiki
Jump to navigationJump to search

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Finished setting 3 of high Q2 electron data taking in the HMS (-3.09 GeV and 35 deg). Completed swing 1/24/2023
  • Helium-3 remains for setting 4 of high Q2 electron data taking in the HMS (-2.72 GeV and 35 deg).
    Carbon took 10 hours beam on time, 24 actual.
    Helium-4 took 11.5 hours beam on time, 17 actual.
    Aluminum stand-in took 4.5 hours beam on time, 6 actual.
    Helium-3 Est to take 27 hrs beam on time, <TBD> actual.
  • Target temperature spike for loop 1 AND loop 2:
    https://logbooks.jlab.org/entry/4117272
    Loop 2 had a spike during production running, will need cut out
    https://logbooks.jlab.org/entry/4117306
  • MCC currently re-steering the beam. Don't know how long this will take


  • Data quality checks of SHMS?

Current Run Plan

Notices in Effect for Shift Crew

Current Issues

  • Accelerator issues to provide high beam current to Hall A and C.
  • Lowering the Hall C current to reduce beam trips in a way the split between Hall A and C current is not in equitable way.


Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests

  • Need to do a BCM calibration at 60uA when Hall A is at low current / down. Coordinating with Hall A RC.