October 3, 2023

From HallCWiki
Revision as of 08:19, 3 October 2023 by Skorodum (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Back to the calendar

RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Zoom remote connection information:
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953

Useful Links

Summary

Monday (10/03) Day shift we moved the NPS calorimeter closer to the target. It took much faster than we expected, so we were done within an hour or so. There was no beam for the rest of the shift due to the accelerator working on the 4th pass separation and setting up the beam delivery to Hall B (https://logbooks.jlab.org/entry/4191156 and https://logbooks.jlab.org/entry/4191329).

We got beam about 10pm on Swing and proceeded according to the updated run plan (https://logbooks.jlab.org/entry/4191362). We took a few elastic runs and then changed the configuration back to KinC_x50_2 production setting. We started actual production data taking about 6 am. We are going to stay at this setting for about 3 days of running.

We will have an RC meeting today at 11 a.m.


Run plan

The run plan is available here: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan