November 2, 2023

From HallCWiki
Revision as of 09:48, 2 November 2023 by Sjdkay (Talk | contribs) (Planned Accelerator Configuration Changes)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Back to the previous page

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success
 Meeting ID: 161 701 5555
 Passcode: 
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Instruction for RCs

Past 24 hours

  • Work in Hall yesterday all completed
    • Well done and thanks to all involved!
  • Beam back around 18:30.
  • Swiftly followed by PSS issues that kept us down until the end of swing.
  • By the time beam was back, NPS temperatures stable, skipped test for setting KinC_x60_4 in the run plan
  • In switching back to KinC_x50_4' kinematic, ran into issues with the magnet GUI
  • GUI was VERY slow and unresponsive, problems from earlier in the day then came back to haunt us
    • HMS Q3 did not seem to display at all
    • Contacted engineer on call, Ellen, who killed a process that improved things.
    • The GUI then became, charitably, usable. We struggled through and got the kinematic set up though (with the added fun of a HMS dipole interlock)
    • Luckily, no further kin changes in the near future, but we should look into this issue further.
  • After that, very little drama. Beam was good overnight and data taking has been ok, with one exception.
    • VME2 and VME3 seemed to die for runs 2524 and 2525. The shift crew only noticed this when they observed that the rates were lower than expected.
    • Please check carefully for issues like this.
    • Hopefully the crew can clarify how they resolved this if they're in the meeting
  • Since then, smooth sailing.

Issues:

  • Magnet GUI very slow/unresponsive
  • VME2/3 not running/dying for some reason
    • Please watch out for this!

RC Summary

https://logbooks.jlab.org/entry/4213959

Current Status

  • Running production on KinC_x50_4'

Near Future Plan

In the near term future:

  • Sometime in the future, we will invite Vlad to give an insight into the high radiation test results.
  • We will perform a corrector coil beam steering test for the next angle setting with a non-zero corrector coil field.
    • Is this still going ahead?
  • Keep running the current setting

Special Studies

  • Moeller run on Monday? (06/11/23)
  • Try to fit in the KinC_x60_4 test?
    • How high priority is this?

Standing Issues

Planned Accesses to the Hall Today

  • None

Planned Accelerator Configuration Changes

  • Pass change is not next Tuesday, it's on the 13th of November (13/11/23). So we have ~10 days of 5 pass beam left.

Special Requests