RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success Meeting ID: 161 701 5555 Passcode: One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Contents
Useful Links
Instruction for RCs
- Half-wave plate change
- Follow the instructions in the link above whenever the HWP is changed flipped.
Past 24 hours
- Generally smooth running with some accelerator related downtime overnight (~1-2 hours).
- Thanks to a lot of hard work from multiple parties over the weekend, the scaler issue now seems to be understood.
RC Summary
Current Status
- Moeller measurement.
- Returning to running production on KinC_x50_4' after.
Near Future Plan
In the near term future:
- Keep running the current setting.
- On Wednesday, we will have ~8 hours or so to access the Hall during the maintenance downtime. Planned activities -
- Heidi wants to take a look at the SHMS door after the issue on Wednesday.
- I will confirm with the PD our plans and get an estimate of when we can expect to get in the Hall before the meeting tomorrow.
Special Studies
- Following the mounting of the borated poly shielding last week, we've now had a chance to assess this a little.
- Paolo will present an update on the radiation simulations.
- Elastics on Thursday (09/11/23) or Friday (10/11/23) next week?
Standing Issues
- Implementing checks for charge asymmetry in alarm handler and online analysis: https://logbooks.jlab.org/entry/4213566
Planned Accesses to the Hall Today
- None
Planned Accelerator Configuration Changes
- Pass change on the 13th of November (13/11/23).
Special Requests
- Stable beam and mercy from the DAQ gods to continue.