November 7, 2023

From HallCWiki
Revision as of 10:47, 7 November 2023 by Sjdkay (Talk | contribs)

Jump to: navigation, search

Back to the previous page

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting-house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMXdsUT09#success
 Meeting ID: 161 701 5555
 Passcode: 
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Instruction for RCs

  • Half-wave plate change
    • Follow the instructions in the link above whenever the HWP is changed flipped.
  • There was discussion of a heat and reactivation in the 08:00 meeting on 07/11/23.
    • If this happens, will need another Moeller measurement.

Past 24 hours

  • Moeller measurement, took a bit longer than planned. An access was required, see Dave Gaskell's summary here.
  • Back to production running after the Moeller measurement.

Issues:

RC Summary

Today's update is here.

Current Status

  • Running production on KinC_x50_4' after.
  • Access to investigate block 497.

Near Future Plan

In the near term future:

  • Keep running the current setting.
  • Wednesday Owl, beam studies from 05:00-07:45
    • We will do a cosmics run of ~2 hours with the sweeper on followed by another ~2 hour run with the sweeper off.
  • On Wednesday, we will have ~8 hours or so to access the Hall during the maintenance downtime. Planned activities -
    • Heidi wants to take a look at the SHMS door after the issue on Wednesday.
    • Noisy block in Column 8, Row 22 - Take a look at if it still looks odd.
    • Wait to see if amplifiers will survive before replacing more bases.
    • Remove more bases - take another column out.
      • One column takes ~1-2 hours (to remove).
      • May have time to remove 2?
    • Measure B field at location of bases?
      • Gain vs x dependence.
      • Does sweep magnet have to be off to get near the NPS?
      • Any measurement has to be done with magnets on and before NPS moved to have any point.
  • Asked MCC for a restricted access ASAP on Wednesday.
    • Radcon has us in the queue, the NL, SL and injector are all going to controlled so will have priority.
    • My suspicion is that we'll be swept around 09:00 with access possible 09:30-10:00.

Special Studies

  • Cosmics with sweeper on vs off - Owl Wednesday
  • Elastics on Thursday (09/11/23) or Friday (10/11/23)?
    • Need to decide on the plan for this before the access.
    • Affects where we leave the NPS when we lock up.

Standing Issues

Planned Accesses to the Hall Today

  • None

Planned Accelerator Configuration Changes

  • Pass change on the 13th of November (13/11/23).

Special Requests

  • Stable beam and mercy from the DAQ gods to continue.