NPS Significant Events
February 20-21: many problems with the spectrometer angle reading https://logbooks.jlab.org/entry/4254775 and https://logbooks.jlab.org/entry/4254934
February 13 owl shift: VTP stuck from run 4374 to 4384.
February 12 day (around 2 pm): the base for pmt 620 goes bad. https://logbooks.jlab.org/entry/4251370
Jan 29 to January 31: FADC for channel 592 was stuck: https://logbooks.jlab.org/entry/4245715
Dec 10, 2023: 11:19, run 3510 HMS Dipole & Q3 tripped. Magnet recovery did not take magnets to MOL. Runs 3511, 3512 possibly affected (optics) before magnets re-ramped to MOL
Dec 9: 4-Pass Separation failure
Dec 8, 15:00 - 17:10 NPS Sweep off for access. Failed to turn back on until 17:10. Run # 3463, 3464 had Sweep Off (LD2 production KinC_x50_2)
December 4 to December 6, 2023: No gas in the HMS drift chambers.Tracking efficiency plot
November 1, 2023: Install Poly shielding on the side of the calorimeter