February 29, 2024

From HallCWiki
Revision as of 09:55, 29 February 2024 by Skorodum (Talk | contribs) (Created page with "[https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Back to the calendar] = RC Meeting Information = Current RC: Iuliia Skorodumina <b> RC Daily Meetings are at...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Back to the calendar

RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Hall status

  • Completed Carbon DIS data taking
  • Completed two cycles of Positron data taking
  • Hall needs to be back to beam permit for the last part of the beam study (~around 3-4pm).
  • MCC will give us 1h heads up before they need the Hall C in beam permit

Accelerator status

  • Maintenance + Beam study (https://logbooks.jlab.org/entry/4258072)
    • Beam off at 7am
    • Maintenance till around noon
    • Beam study till 19:30pm
    • Beam to the halls, ~21:00pm
    • Scheduled can be shifted a bit depending on how things go..

Planned Access to the Hall

  • https://logbooks.jlab.org/entry/4258144
  • NPS: Julie, Josh, Aaron to look at the temperature read back issue
  • Heidi: checking Dipole (----> DONE)
  • Hanjie, Alexandre: checking NPS crate fans (---> DONE)
  • Larry, Jerry, Bob: Pumping SHMS magnets
  • Bill: SHMS hut temperature sensor --> DONE; Summary: https://logbooks.jlab.org/entry/4258173
  • Walk-thru at 1pm: Joe + 5 FIU students (6 keys)
  • Facilities: lowering AC set point to 65F (---> DONE)


  • Other work planned during the downtime
    • Ellen and Heidi: updating magnet software
    • Hanjie will use the DAQ (will notify the shift crew before/after she is done)

Current Run Plan


Notices in Effect for Shift Crew

Current Issues

  • NPS crate #2 drops occasionally
    • Not much reported recently, taking 30min runs (restarting a new run more often) seems helping
  • NPS crate temperatures

Special Requests

  • Guard house work till Friday. Pay attention to the sign and follow the directions around there when coming to the accelerator site.