Dec 10 2024
From HallCWiki
Jump to navigationJump to searchBack to Main Page >> Weekly meetings
Agenda
Notes
- GEM tests are going on in the test lab, probably won't be moved to the hall until January; waiting for a bracket for GEM foil tension etc.
- Bill and Hanjie are running fibers for TI and network switch from the SHMS hut to the LAD bunker
- One LAD Panel is tested in the hall and installed: SHMS needs to be moved to a smaller angle because of the LAD panel holding bars too close to the SHMS; the holding bars won't be there once the installation is complete.
- Need to run 3 LEMO cables between the SHMS hut and LAD bunker: two LAD triggers, EDTM; Bill will run 4 cables
- One more panel would be moved to the hall next week
- V1495 for LAD trigger is ready, 5 vmeDSC boards are ready