30 PAC Days of Beam
With 30 PAC days of beam, we can split the time up into three measurements:
<math>Q^2</math> (GeV2) |
Time (Hours)
|
1.5 |
600 (25 days)
|
0.7 |
100 (4 days, 4 hours)
|
0.3 |
20
|
Total |
720 (30 days)
|
Measurement Summary
Details of measurements
Q2 = 1.5 GeV^2
|
|
Q2 = 0.7 GeV^2
|
|
Q2 = 0.3 GeV^2
|
|