RC Meeting, Monday, August 20
From HallCWiki
Jump to navigationJump to search
- General
- No hall lockup tonight
- Beam is possible, Tuesday night, but not likely. Will not cancel shifts until certain though
- Issues with the upstream beamline vacuum. Ion chambers not yet on
- Still work to be done in hall before ready for lockup
- Need to look into merging the KAON
- Target
- Scattering chamber leak repaired over the weekend (big thanks to Dave Meekins, Chris Keith, and Walter Kellner for coming in)
- Target cooldown underway
- SHMS
- HGC at 1 atm of C4F8O
- HMS
- Cerenkov window repaired and installed
- Cerenkov at 0.45 atm, C4F8O
- DAQ