RC Meeting and Runplan, Saturday, August 25
From HallCWiki
Jump to navigationJump to search
- Status
- No beam to hall overnight
- Hoping to send CW to Hall C despite trouble sending 5 pass to Halls B and D
- Progress slowed by dump FSD issue
- Run plan
- Saturday SWING-Sunday OWL and DAY
- Initial beam setup to the hall
- If MCC asks, the Compton electron detector is OUT
- Make sure target is OUT
- After initial setup - SHMS steering plan will be executed (please call RC if not already on site). When MCC asks, ramp up magnets (one at a time) to settings for -6.053 GeV.
- After completion of SHMS steering plan, proceed with detector and trigger checkout. Call experts before start (Malace, Pooser, Berdnikov, Ambrose for detector checkout, Malace, Poose, Huber, Trotta for trigger checkout)
- Saturday SWING-Sunday OWL and DAY