  • Status
    • Target is setup so that selection of liquid targets is disabled.
    • Current program is establishing beam to Halls C and D, simultaneously. Beam is highly unlikely in our hall until just after midnight. Slim possibility at the end of Swing shift tonight. We will begin with Jay's beam deflection test. SHMS and HMS are set at the first angles we need (6.66 and 13.5 deg, respectively). SHMS was ramped today to -8.035 GeV and back to 0 for testing of procedures and magnets.
  • Runplan
    • Beam deflection test: [1]
    • Starting at 5 pass. Updated plan here: [2]