RC Meeting and Runplan, Tuesday, Sept 25

From HallCWiki
Revision as of 15:05, 25 September 2018 by Hszumila (talk | contribs) (Created page with "* '''Status''' ** Beam last night was big at the target, and a Moller quad was found to have been turned on last evening during beam tuning. Latest scans taken this morning: h...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
  • Runplan
1. Get beam into Hall with reasonable beam spot size, big BPM calibration, ion chamber calibration. 
2. SHMS deflection test (approximately 2.5-6 hours, 10-20 uA). Call experts for step 4 when ramping Q3.  
3. Check beam spot with harps, beam on yag with and without raster, carbon hole (5 uA)
4. Detector and trigger checkout (see run plan). Calibration runs request 50 uA, 65 uA, and 20 uA (we will be capped tonight).
  • Accesses
    • Dave Meekins needs short access tomorrow morning to begin condensing the target (probably around 8am-ish)
    • Jerry needs something from the hall and will coordinate with radcon