RC Meeting and Runplan, Friday, Sept 28
From HallCWiki
Jump to navigationJump to search
- Status
- Yesterday the HMS quad work was completed by about 1pm and we started the optics study of HMS/SHMS at high momentum.
- Beam was bad until around 6pm when MCC had solved the problem of the many trips coming from Hall B beam.
- When changing to set the HMS at 6 GeV , The HMS Q3 would not stay at a given set current. This put into doubt the the higher momentum HMS optics data (taken at 6.6 and 6.3).
- MCC was able to deliver up to 60uA on the owl shift. Given problem with HMS, decided to do the BCM which was completed. After BCM data was taken , then continued with the SHMS optics which was completed.
- The Hall went into controlled access around 8:30 for work on the HMS Q3. Found that the opto-isolator was not pushed in all the way.
- Around 9:00, MCC started the pass change for Hall A.
- Around noon, started to receive beam and restarted the optics study for HMS ( repeated some SHMS)