RC Meeting and Runplan, Saturday, Sept 28

From HallCWiki
Revision as of 15:18, 29 September 2018 by Jones (talk | contribs) (Created page with "*''Status'' ** Finished 5 of 8 hydrogen kinematics points ** Beam unstable. Seems that maximum is going to be 30-40uA for the weekend. *''Issues'' **Main issue is with HMS D...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
  • Status
    • Finished 5 of 8 hydrogen kinematics points
    • Beam unstable. Seems that maximum is going to be 30-40uA for the weekend.


  • Issues
    • Main issue is with HMS Dipole LN2 level. https://logbooks.jlab.org/entry/3600022 .The users have to manual change the valve for JT3. There is a alarm to let you know if it get outside its limits but it is best to monitor it so that try one can keep it from reaching extremes.
    • Tuesday RF studies. Can fix the JT3 problems then.