RC Meeting and Runplan, Sunday, Sept 30

From HallCWiki
Revision as of 15:21, 30 September 2018 by Jones (talk | contribs)
Jump to navigationJump to search
  • Status
    • Took elastic data until midnight. Nearly finished. Just 1/2 of last point.
    • Midnight accelerator took the beam away to do injector work Beam basically off since then.


  • Issues
    • Still manual change JT3 value. As become fairly stable.
    • RF work on Tuesday. Work on JT3 then.