RC Meeting and Runplan, Sunday, Sept 30
From HallCWiki
Jump to navigationJump to search- Status
- Took elastic data until midnight. Nearly finished. Just 1/2 of last point.
- Midnight accelerator took the beam away to do injector work Beam basically off since then.
- Analysis
- HMS optics . https://hallcweb.jlab.org/DocDB/0009/000991/001/HMS%20Optics.pdf
- More HMS optics summary [1]
- Issues
- Still manual change JT3 value. As become fairly stable.
- RF work on Tuesday. Work on JT3 then.