RC Meeting and Runplan, Sunday, Sept 30

From HallCWiki
Revision as of 15:31, 30 September 2018 by Hszumila (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
  • Status
    • Took elastic data until midnight. Nearly finished. Just 1/2 of last point.
    • Midnight accelerator took the beam away to do injector work Beam basically off since then.


  • Issues
    • Still manual change JT3 value. As become fairly stable.
    • RF work on Tuesday. Work on JT3 then.