Kaon LT Status Page

From HallCWiki
Revision as of 09:31, 2 October 2018 by Jones (Talk | contribs) (Created page with "* Table of Kaon LT Commissioning Status. {| class="wikitable" | '''Item''' || '''Status''' || '''Comment''' |- |Detector Checkout || Completed || |- |HMS Trigger PID || Com...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Table of Kaon LT Commissioning Status.
Item Status Comment
Detector Checkout Completed
HMS Trigger PID Completed
SHMS Trigger PID Completed
BPM calibration check Not done Need to have 7A harp operational, during Friday down will be looked at
Beam energy measurement Not done
High and low current BCM calibration Completed low current up to 50uA ([Run ])
HMS/SHMS optics study Completed
HMS/SHMS single arm elastic Completed
HMS/SHMS coincidence ep elastic Completed 25K events ( wanted 50K)
Golden HMS/SHMS sieve run Completed Used to check the stability of beam positions at different energies
Luminosity scan Not done Need fairly stable 65uA
  • Table of Kaon LT Physics Status
Item Status Comment
Q2=3.0 W=2.32 x=0.40 theta_Shms=15.18 Completed
Q2=3.0 W=2.32 x=0.40 theta_Shms=18.18 Completed
Q2=3.0 W=2.32 x=0.40 theta_Shms=21.18 Completed
Q2=2.115 W=2.95 x=0.21 theta_Shms=7.74 Not done LH2 (10hr) and Dummy (1hr) at 70uA
Q2=2.115 W=2.95 x=0.21 theta_Shms=10.74 Not done LH2 (10hr) and Dummy (1hr) at 70uA
Q2=2.115 W=2.95 x=0.21 theta_Shms=13.74 Taking data Started at 9:30 Tuesday Oct 2;LH2 (10hr) and Dummy (1hr) at 70uA