RC meeting and Run Plan, Thursday Oct. 4
From HallCWiki
Jump to navigationJump to search
- Status
- Kaon LT status page
- Beam energy measurement done [1]
- Luminosity scans deferred to a later time so we can take the very bear minimum statistics for the current kinematic point
- Issues
- Need higher beam delivery eff. since we are sooo behind
- Plans - Physics by Friday 7 am
- Finish the "right" kinematics then go back to "center" and finish taking 25 K. If time left, take more statistics for "right", "center", "left"
- Plans - Access Friday
- RadCon will come in for survey Friday 7am survey
- SHMS aerogel tray change: ~6-8 hours
- Jack, Steve will go in to check on that HMS Dipole LN2 JT valve
- Howard will go in to check on the over-active group of wires in HMS DC1X2
- 3HC07A harp checkout