RC meeting and Run Plan, Tue Oct. 9

From HallCWiki
Revision as of 14:54, 9 October 2018 by Simona (Talk | contribs)

Jump to: navigation, search
  • Status
    • Data taken so far [1]
    • Beam quality [2]
  • Issues: Resolved
    • HMS dipole LN2 JT4 valve
    • SHMS rotation: checked by Steve, until we have the breaks working this [3] may happen; be very careful when rotating.


  • Requiring attention
    • The Hall C truck ramp beacon [4]
    • Monitor HALLC:p [5]


  • Plans - Physics
    • Take data at Q2=3. W=3.14 x=0.25 theta_Shms=12.42 to reach 65% of desired stat. goal.
    • Change SHMS angle to 9.42 deg and take LH2 and Al data